Pool-bridge for the Langnese Summer-Club 2004
The bridge consists of 206 different joints and 220 rods. Each rod and joint was individually manufactured and afterwards put together like a puzzle. Intentionally the looks of the bridge bear a certain randomness, this is, however, the result of strict precise system technology.
(Click on the pictures to enlarge them)
|
Span length: 14m Load capacity: 15t on a area of 30 m2 Site: Isla Cristina, Spain Construction time: 14 days with 3 men Architect: Christoph Tönges
|
|
|
The prefabricated parts are assembled at the construction site.
|
|
|
The finished girders are placed above the pool with a crane.
|
|
|
The proud architect and his building.
|
|